Resolution - Approval of Transmission Pole Contracts for Burnet to Bertram to Andice - B Gedrich
Other Info
Submitted By: Brian Gedrich
Department: Engineering
Financial Impact and Cost/Benefit Considerations: As discussed in Executive Session
Discussion
Recommendation to purchase poles to upgrade the Burnet - Bertram - Andice transmission line to bundled 795 ACSR 138kV. The project will include the rebuild of 23.25 miles of wood pole 69-kV transmission line with galvanized steel transmission poles. Approximately 2 miles of the existing transmission line is located on double-circuit structures owned by LCRA Transmission Service Corporation (LCRATSC). This 2-mile section will be upgraded by LCRATSC with PEC owning the conductor and the optical ground wire for the PEC circuit from Burnet to Bertram. The transmission line upgrade improves the existing line by increasing the capacity, adding optical ground wire fiber to improve communications and reliability, and allowing an additional transmission line to be installed on the same structures.
Body
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE COOPERATIVE that the Cooperative approve the transmission pole contract for the 2019 CIP Project T469-T326 Whitestone-Blockhouse-Leander Transmission Line Rebuild and Upgrade; and
BE IT FURTHER RESOLVED, that the Chief Executive Officer, or designee, is authorized to take such actions as needed to implement this resolution.