Draft Resolution - Approval for Construction Contract, Wirtz to Flat Rock to Paleface - B Gedrich
Other Info
Submitted By: Brian Gedrich
Department: Engineering
Financial Impact and Cost/Benefit Considerations:
Discussion
Recommendation is to approve this resolution to enter a contract for the construction of an upgrade in the capacity of the T365 Wirtz to Flat Rock to Paleface from 130 MVA to 440 MVA by replacing existing structures, conductor and shield wire. The project also improves clearances over three crossings of Lake Marble Falls in order to comply with state safety requirements for lakes. The project is part of a plan to exit the Wirtz RAS and improve the overall reliability of transmission service to members served by Flat Rock Substation, Paleface Substation, and the broader PEC and ERCOT transmission system. The scope of the project includes replacement of the existing shield wire with OPGW and existing wood pole structures with steel structures. Approximately 50% of the wood pole structures were replaced as part of a rehabilitation project in 2018.
Body
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE COOPERATIVE, that the Chief Executive Officer, or designee, is authorized and directed to negotiate, execute, and deliver a contract for construction services to upgrade the Wirtz to Flat Rock to Paleface transmission line; and
BE IT FURTHER RESOLVED, that the Chief Executive Officer, or designee, is authorized to take all such actions as needed to implement this resolution.